Site Plans LLC d/b/a Make A Site PlanPermit drawings for all 50 states
Skip to content

Legalize Unpermitted Work

Bought a house with an unpermitted addition, conversion or deck? Or got a code enforcement notice? Legalizing starts with accurate drawings.

  • As-built drawings of the existing work
  • Code upgrade details where needed
  • Help understanding the office's path

Get a legalization quote

Send the address and what you are building. We reply with the scope, price and timeline.

Enter your name.

Enter a valid email address.

Enter a valid phone number.

Enter the property address.

Select a project type.

Tell us briefly about the project.

Survey, sketches, photos, old plans or city comments. PDF, JPG, PNG, DWG or DXF. Up to 5 files, 15 MB each.

Up to 5 files, 15 MB each.

By sending this form you agree to our Privacy Policy. No spam, ever.

How legalization usually works

Most jurisdictions handle unpermitted work through an after-the-fact permit. You submit drawings of what was built, plus any changes needed to meet code. Inspectors then check the work, which may involve opening walls or ceilings.

Every office handles this differently, and fees or penalties are set locally. We prepare the drawings and help you understand the requirements. The jurisdiction makes the final decisions.

What we can prepare

  • As-built site plan with setbacks
  • As-built floor plans and elevations
  • Structural documentation
  • Electrical, plumbing and HVAC as built
  • Code upgrade details: egress, alarms, fire separation
  • Notes on items needing inspection access
Permit drawing set open on a table at a construction site

Typical permit set

The sheets below are typical. We include only what your project and jurisdiction require.

  • Site planAs built
  • Floor plansAs built and proposed fixes
  • ElevationsAs built
  • StructuralDocumented and upgrades
  • MEPAs built

What we need from you

  • Address and description of the work
  • Photos inside and out
  • Measurements
  • Any notice from the city or county
  • Approximate date of construction if known

How it works

  1. Send project information

    Share the address, what you want to build and any survey, photos or old plans you have.

  2. We review the requirements

    We check the jurisdiction, zoning setbacks and what the permit office asks for on this project type.

  3. Scope and price confirmed

    You get a written scope, price and timeline before any drafting starts.

  4. Drawings prepared

    Our drafters prepare the sheets to scale, with the notes and details your reviewer expects.

  5. You review the set

    You check the drawings and request changes. We revise before anything is submitted.

  6. Professional review if needed

    Where a seal is required, licensed professional review and signature are coordinated, subject to their acceptance.

  7. Permit comments handled

    If the reviewer sends comments, we address them within the agreed scope.

Common permit issues

Setback violation

Work too close to a line may need a variance. We identify it.

Egress missing

Converted rooms often lack egress. We detail a fix.

Unknown framing

Hidden structure may need inspection. We note it.

Electrical unknown

Wiring may need verification. We document what is visible.

Fire separation

Garage conversions often lack it. We detail upgrades.

Code edition

Some offices apply current code. We check.

Frequently asked questions

Can all unpermitted work be legalized?

Not always. Some work needs changes or removal to comply. The jurisdiction decides.

Will I have to open walls?

Sometimes. Inspectors may need to see framing, wiring or plumbing.

Should I legalize before selling?

Many owners do because buyers and lenders ask about permits. Talk to your agent or attorney about your situation.

Legalize existing work

Send photos and a description. We outline the drawings needed.

CallWhatsAppGet a Quote